Unsubscribe from postal mail → 522 Bourbon St – NOLA.Today

522 Bourbon St

VCC General Work Permit

Street View of 522 Bourbon St
Structural repairs at tower, per attached materials stamped VCC approved 04/02/2024, to include installation of round plates, tiebacks, and embedded helical ties.
Repoint masonry utilizing mortar mixed and applied per the VCC standard detail sheet (attached)
Any deteriorated, cracked, or broken bricks shall be replaced to match existing in color, size, material, porosity, detail, profile and exposure.
All reinstalled masonry must be properly "toothed in" to existing masonry wall, using VCC mortar formula (attached).

VOIDS IN THE BRICK ARE NOT TO BE FILLED WITH MORTAR. BROKEN, DETERIORATED BRICKS MUST BE REPLACED WITH BRICKS MATCHING THE PREVIOUS.

All mortar to be mixed using the VCC recipe (attached) with a maximum of 1 part Portland Cement, to 3 parts lime, to 9 parts sand, and enough water to form a workable mix. Prepackaged mixes are not permitted. The resulting mix should range in color from off-white to beige but should not be grey or white in color.
MORTAR IS NOT TO BE APPLIED OVER THE FACE OF THE BRICKS UNDER ANY CIRCUMSTANCES.
Ref code BAF07Q
?