Junk happens. Text a photo to Mel and make it disappear. → 615 Pere Antoine Aly – NOLA.Today

615 Pere Antoine Aly

VCC General Work Permit

Street View of 615 Pere Antoine Aly
To perform exploratory subsurface demolition near Pere Antoine Alley and Chartres as per Architecture Committee approval of 10/10/2023 and materials stamped VCC approved 10/18/2023. Work includes:
• Map and photograph all existing flagstone and stone stoop components; number each flagstone.
• Remove flagstone and stoop by hand, clean, and store in the Cathedral garden.
• Sawcut existing sidewalk/mortar bed as required to gain access to foundation.
• Hand dig through foundation substrate to expose spread footing, down to the bottom of the footing. Jack-hammering not permitted.
• Remove all spoils from the building and haul off of the site.
• Following inspections, the area to be filled with clean sand, to be compacted.
• Replace the concrete sub-foundation to match the existing adjacent concrete.
• Restore the stoop and flagstones in soft mortar beds, matching existing, and to replace any broken flagstone with new matching flagstone.
Ref code 2A6Q3B

Documents

?