Work approved:Ref code QBDY1M
To prepare for painting by sanding (rotary sanders cannot be used), making minor millwork and masonry repairs as necessary to match existing conditions (masonry mix must be soft, with maximum Portland cement content not to exceed 1 part to 12) and to paint as follows to match existing conditions:
To perform general maintenance work for a period of six months from the date of this permit. Permitted work includes touching up paint, minor millwork repairs, and minor repointing as follows:
To prepare for painting by sanding (rotary sanders cannot be used), making minor millwork and masonry repairs as necessary to match existing conditions (masonry mix must be soft, with maximum Portland cement content not to exceed 1 part to 12) and to paint as follows to match existing conditions:
•Wood-clad walls...Spring Water, flat or satin finish
•Stucco walls...Warm Beige
•Wooden elements including doors, windows, frames, fascia/soffit/outriggers of gallery...White, semigloss
•Shutters…French Quarter Green, semigloss
Tuckpoint as necessary throughout property using VCC approved mortar mix (attached); rotary grinders are not permitted.
This permit prohibits the application of the following exterior coating materials and paints: sealers; ceramic coatings/paints; elastomeric coatings/paints; waterproofing/water repellent coatings.