6501 Florida Ave

New Construction Permit

Street View of 6501 Florida Ave
This permit includes the following upgrades and improvements to the East Bank Sewage Treatment Plant located at 6501 Florida Avenue: a new electrical building for the North RAS Pump Station replacing an existing electrical room. This is shown as Area Code 52 on the site key plan included as drawing G-00-101. Refer to drawings associated with Area Code 52 for this new electrical building within the uploaded drawings. This project will include other improvements submitted under a separate Structural Renovation Permit and Structural Non-Renovation Permit. A contractor will be awarded this project once the bidding phase is completed. This project is currently between 90% design and 100% design. It is expected to be advertised for bid in March 2025. At this time, the contractor's information and quote for the work will be provided. A preliminary cost of $15 million is listed as a placeholder.

*FINAL INSPECTION* FEMA EC BFE +5.0 NAVD
Ref code A2QH83
?