Opt out of physical junk mail → 7924 Breakwater Dr – NOLA.Today

7924 Breakwater Dr

New Construction Permit

Street View of 7924 Breakwater Dr
New construction of a boathouse and add a third floor. BFE +18.0 NAVD to the lowest horizontal memeber V zone elevation requirement. If the front and/or rear of the structure is enclosed and is below the lowest horizontal member requirement of +18 NAVD- IT MUST BE DESIGNED AND CONSTRUCTED WITH BREAK-AWAY WALLS.

NEED COMPLIANT FEMA EC BFE +18.0 NAVD LOWEST HORIZONTAL MEMBER AND V ZONE CERTIFICATE FOR FINAL. Any walls below BFE +18 lowest horizontal member must be designed as break-away walls in accordance with FEMA NFIP regulations.
Ref code UYSZUM

Documents

?