Looking to declutter? Mel is your research assistant. → 520 Saint Louis St – NOLA.Today

520 Saint Louis St

VCC General Work Permit

Street View of 520 Saint Louis St
To reconstruct collapsed cornice and repair roof at front slope of main building, per 07/29/2025 Committee approval and attached drawings stamped VCC approved 08/01/2025. All mortar to be VCC formula, attached. Mortar may not be tinted with any additives, and must not be applied to the face of the brick. NO prepackaged mixes are permitted.

NOTE: ALL MASONRY WORK TO MATCH EXISTING IN MATERIAL, SIZE, REVEAL, DIMENSION, PROFILE, EXPOSURE, ATTACHMENT, POROSITY, HARDNESS, COLOR, TEXTURE AND DETAIL. SUBMIT MASONRY SAMPLE TO VCC STAFF TO CONFIRM MATCH PRIOR TO INSTALLATION.
Ref code 27GSEC
?