Unsubscribe from postal mail → 301 Dauphine St, Corridor 4th floor – NOLA.Today

301 Dauphine St, Corridor 4th floor

VCC General Work Permit

Street View of 301 Dauphine St, Corridor 4th floor
To install new rooftop mechanical equipment, associated lines, and new air intake louver, per Architecture Committee approval of 08/27/2024 and materials stamped VCC approved 11/01/2024. Work includes:
• Installation of new VRF-HP mechanical unit on enlarged existing mechanical rack
• Installation of associated lines from equipment and running down and around to the rear of the third floor. Lines to be sleeved and the sleeve painted to match the adjacent building surface
• Installation of new air intake louver on the rear of the third floor. Louver to be painted to match the adjacent building surface.
Ref code XCXL5D
?