Fortified PlatinumRef code MF1XC2
- Remove, Haul, Tear - Off & Dispose of 1 Layer of Existing Roof.
- Nail the existing roof deck with 8d ring-shank nails at 4 in. o.c. per F-RR-3.
- Install Deck Tape on decking seams throughout the entire roof.
- Install Weatherlock Owens Corning Ice & Water Shield per code.
WeatherLock® Mat Self-Sealing Ice & Water Barrier on valleys and around openings.
- Install RhinoRoof Synthetic Underlayment for added Protection Against Moisture & Wind Driven Rain.
(Bond break between shingles and Ice-and-Water shield)
- Install new Fortified drip edge:
Eave drip edges shall extend 1 2 in. below sheathing and extend back on the roof a minimum of 2 in.
The drip edge shall be mechanically fastened to the roof deck at maximum of 4 in.
- Install double sided starte shingle roll on entire perimeter.
-Owens Corning™DURATION® Series ShinglesAdvantages: SureNail® Technology - Owens Corning®
- Owens Corning™PROEDGE® Hip & Ridge Shingles
- Remove ridge clay tile and Install Ridge Vent OC Venture & Eave Vents
-Bullet Boots - 35 year warranty with 100% UV protected.
Advantages: Bullet Boots come with rodent screen built in the top. This prevents rodents, birds, and
other critters from entering the vent. As well, the screen prevents unwanted debris from entering the
vent
-Apply Caulk to All Flashings to Seal Properly and Avoid Corrosion Modified Bitumen Replacement:
- Remove, Haul, Tear - Off & Di